mentari
Saturday, August 27, 2005
i long for sept 5th to come as my pay will get me a new fone but at the same time, i am afraid of sept as the ultimate deadline is on the 16th and there is so much to do icluding a maximum of 8 A1 panels - filled with 2d drawings, 3d axonometric view (which takes the longest time), 3d model to scale, detailings, - design journal, 3d model, and hta essays.
that is when the title wake me up when september ends serves its purpose.
yestrday, the trip to newater building at tanah merah was a short one, explaining in detail on how the household n other waste water is processed to a clean one.
forgot my dgcam again, such a waste when the building was a stunning views filled with water concept elements. the fountains were fabolous but it is meaningless when it is displayed at such a remote and secluded place on an industrial site.
8/27/2005 03:02:00 PM